首页> 美国政府科技报告 >Experimental Response and Analysis of the Evergreen Point Floating Bridge;Research rept
【24h】

Experimental Response and Analysis of the Evergreen Point Floating Bridge;Research rept

机译:常绿点浮桥的实验响应与分析研究进展

获取原文

摘要

On January 20, 1993, the Evergreen Point Floating Bridge incurred structural damage at two mooring cables and at various other locations during a storm event of approximately a 20-year return period magnitude. The two mooring cables damaged were the shorter and stiffer cables located at the ends of the bridge. Following the 1993 storm, larger mooring cables with Sealink elastomeric devices were installed at the areas where cable distress was noted to resist higher cable loads and to provide energy absorption and reduced cable stiffness. In this study, cable forces were measured during the winter season of 2001-2002 to evaluate the effectiveness of the replacement mooring cables. From the experimental measurements, it was found that the special replacement mooring cables have reduced the load attraction at the shorter end cables when compared to cable tension values reported for the pre-retrofit analysis. However, the measurements indicate that the replacement cables continue to attract loads between 64% and 79% higher than those measured at the longer and more flexible cables located near the midspan of the floating bridge during storm events of a 1-year return period magnitude.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号