首页> 美国政府科技报告 >Pumped-Slurry Backfilling of Abandoned Coal Mine Workings for Subsidence Control at Rock Springs, Wyoming
【24h】

Pumped-Slurry Backfilling of Abandoned Coal Mine Workings for Subsidence Control at Rock Springs, Wyoming

机译:废弃煤矿工程的抽水泥浆回填,用于怀俄明州洛克斯普林斯的沉降控制

获取原文

摘要

The Bureau of Mines, at the request of local authorities in Rock Springs, WY., investigated and conducted through contracts a multistage program of exploratory drilling and pumped-slurry backfilling of 15 areas of potential subsidence in abandoned mine workings underneath that community. Initially, the Bureau in 1969 had recommended a program of gravity blind flushing of some of the inaccessible mine voids, and in 1970 a new technique, the pumped-slurry injection process, was tested for the first time in a site adjacent to the city area of severe surface subsidence. Success of this initial testing program, and of a large-scale project in Scranton, PA., led to further large-scale projects, funded by Congress, that resulted in the successful backfilling not only of all 15 target areas of potential subsidence in Rock Springs, but also of several areas in other States. Total cost of the projects in Rock Springs, including the original pumped-slurry test, was $3,243,993. A total of about 923,000 tons of sand was injected hydraulically into mine voids, rendering 178 acres of residential and central-downtown areas of Rock Springs less susceptible to subsidence damage.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号