首页> 美国政府科技报告 >Optimization of the short term operation of a cascade of hydro power stations
【24h】

Optimization of the short term operation of a cascade of hydro power stations

机译:优化水电站的短期运行

获取原文

摘要

We study the operation of a cascade of hydropower stations for given time varying prices and given inflows. The objective is to maximize the value of the power output, under constraints on final dam contents. The flow of the river is modelled through nonlinear PDE:s, the St. Venant equations, which has to be solved iteratively. For the stations empirical but smooth efficiency curves are used. Using the structure of the problem, a descent method of reduced gradient type is developed. The problem has also been successfully convexified temporarily to avoid getting trapped in local minima. Further, scaling of the problem has been used with a rather dramatic success. MATLAB computations on a small but realistic problem are presented

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号