首页> 美国政府科技报告 >Pool 5 Channel Management Study. Mississippi River 9-Foot Channel Project, Channel Management Program. Definite Project Report/Environmental Assessment. Pool 5, Upper Mississippi River, Buffalo County, Wisconsin and Wabasha and Winona Counties, Minnesota
【24h】

Pool 5 Channel Management Study. Mississippi River 9-Foot Channel Project, Channel Management Program. Definite Project Report/Environmental Assessment. Pool 5, Upper Mississippi River, Buffalo County, Wisconsin and Wabasha and Winona Counties, Minnesota

机译:第5组渠道管理研究。密西西比河9英尺通道项目,渠道管理计划。明确的项目报告/环境评估。游泳池5,密西西比河上游,布法罗县,威斯康辛州和Wabasha和Winona县,明尼苏达州

获取原文

摘要

The purpose of this study was to evaluate channel management in pool 5 on the Mississippi River, from Lock and Dam 5 at river mile 738.2 upstream to Lock and Dam no. 4 at river mile 752.8. Study efforts focused on measures to reduce the frequency of dredging problem areas, preventive maintenance, and using dredged material to construct islands habitat purposes. No significant navigation problems were identified aside from channel shoaling in the mid-pool reach. There has been significant decline in fish and wildlife habitat in the lower portion of pool 5 due primarily to loss of islands, sand sediments in backwater habitats, decline in aquatic vegetation and a reduction in bathymetric diversity. The primary restoration measure is the construction of five small islands in lower Belvidere Slough area using channel maintenance dredged material. Wing dam notching will also improve fish habitat.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号