首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Woodland Dam (ME 00218), Saint Croix River Basin, Baileyville, Maine, United States and St. Stephen, New Brunswick, Canada. Phase I Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. Woodland Dam (ME 00218), Saint Croix River Basin, Baileyville, Maine, United States and St. Stephen, New Brunswick, Canada. Phase I Inspection Report

机译:国家非联邦大坝检查计划。 Woodland Dam(mE 00218),圣克罗伊河流域,Baileyville,缅因州,美国和圣斯蒂芬,新不伦瑞克省,加拿大。第一阶段检查报告

获取原文

摘要

The overall length of the concrete gravity dam and spillways is about 1910 ft. with a maximum height of about 39 ft. The dam is generally in fair condition. There were no signs of impending structural failure or other conditions which would warrant urgent remedial attention. It is intermediate in size with a hazard classification of high. There are various remedial measures which should be undertaken by the owner to assure the continued performance of the dam. (Author).

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号