...
首页> 外文期刊>International journal of service science, management, engineering, and technology >Critical Factors to Overcome Project Scope Creep in the Oil and Gas Industry: Analytic Hierarchy Process Approach
【24h】

Critical Factors to Overcome Project Scope Creep in the Oil and Gas Industry: Analytic Hierarchy Process Approach

机译:Critical Factors to Overcome Project Scope Creep in the Oil and Gas Industry: Analytic Hierarchy Process Approach

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This study aims to determine procurement and project management critical factors to develop procurement strategy with stakeholders to eliminate project scope creep (PSC) risks in the oil and gas (OG) sector. Analytical hierarchy process (AHP) methodology is applied to prioritize the critical factors from tendering management (TM), contract quality (CQ), and project management (PM) criteria to solve the PSC problem. Data are from eight managerial levels and two specialists from procurement and project departments of two OG companies in the UAE context. The study revealed that there are six factors out of 15 that are critical factors from procurement management: 1) tender strategy, 2) tender clarifications meetings and negotiation, 3) tender document preparation, 4) techno-commercial bids evaluation and award, 5) well-written contracts, and 6) supplier selection criteria. This study provides managers with tools and strategies for successful project management practices in the UAE.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号