...
首页> 外文期刊>RIBA journal >Getting to grips with Passivhaus through the Plan of Work
【24h】

Getting to grips with Passivhaus through the Plan of Work

机译:Getting to grips with Passivhaus through the Plan of Work

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In the context of its 2030 Climate Challenge, the RIBA has launched a Passivhaus Overlay to the Plan of Work to make it easier for architects and clients raise their sustainability game. The initiative, in partnership with the Passivhaus Trust, will help project teams to make informed design decisions at the right time to reach Passivhaus standards. According to author, architect and certified Passivhaus designer Mark Siddall, the Overlay provides a useful starting point for any project team aiming to boost sustainability and work towards the Passivhaus standard. The document gives valuable insights into the actions, considerations and processes relevant at each RIBA Stage, outlining the sequences and workflows that successful Passivhaus projects follow. It is not intended to be a standalone guide to achieving the Passivhaus standard, rather providing clarity on the order of effective decision making and design exercises to achieve streamlined certification. Additional guidance and resources are signposted in the document.

著录项

  • 来源
    《RIBA journal》 |2023年第4期|41-42|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 英语
  • 中图分类
  • 关键词

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号