A post occupancy evaluation can reduce building operational costs and increase occupant productivity. But what happens when it shows a building is not performing to the expectation of its original design? Building operational failures can be regarded as teething problems, common with settling in, and are often blamed on poorly drafted contract requirements. The failure of building owners and contractors to understand contract mechanisms is a leading cause for dispute in the construction industry.
展开▼