首页> 外文期刊>Tunnelling and underground space technology >Model test of prefabricated underground utility tunnel crossing active ground fissures
【24h】

Model test of prefabricated underground utility tunnel crossing active ground fissures

机译:Model test of prefabricated underground utility tunnel crossing active ground fissures

获取原文
获取原文并翻译 | 示例
           

摘要

? 2023The establishment of an underground utility tunnel system has been projected for Xi'an, the transportation center in western China. However, this city are suffering the damage that ground fissures have inflicted on the subterranean engineering. The traditional cast-in-place underground utility tunnel could not well adapt to thr activity of ground fissures. The activity of ground fissures may result in numerous damages such as tunnel fractures and waterproof failure. To reduce such hazards, a large-scale physical model was set up to study the stress and deformation characteristics of the prefabricated underground utility tunnel crossing active ground fissures. The findings from the analysis of the soil pressure, distribution of soil cracks, and structure deformation show that waterproof rubber is more susceptible to failure due to a large interface tension displacement occured near the ground fissure.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号