...
首页> 外文期刊>Quality Engineering >Computing the Percentage Points of the Run-Length Distributions of Multivariate CUSUM Control Charts
【24h】

Computing the Percentage Points of the Run-Length Distributions of Multivariate CUSUM Control Charts

机译:Computing the Percentage Points of the Run-Length Distributions of Multivariate CUSUM Control Charts

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Multivariate CUSUM control charts are often used instead of the standard Hotelling's control charts in many practical problems when detection of small shifts in the process mean is important. However, design of multivariate CUSUM control charts are usually based on the average run length (ARL). In this work, we will compute the percentage points of the run-length distributions of two multivariate CUSUM control charts. It will be shown that interpretations based on ARL can be misleading since the in-control run-length distribution of a multivariate CUSUM is highly skewed. On the other hand, the percentage points of the run-length distribution provide additional information such as the median run length, early false out-of-control signals, and the skewness of the run-length distribution for a particular scheme. This extra information might provide quality control engineers further knowledge of a particular multivariate CUSUM control chart scheme.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号