...
首页> 外文期刊>Water Environment & Technology >Building bigger and better
【24h】

Building bigger and better

机译:建设更大更好

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Poplar Point Pumping Station has been operating in Washington, D.C., since 1915. Upon flow testing a few years ago, the station, which has a design capacity of 170,300 m~3/d (45 mgd), only could pump 166,160 m~3/d (43.9 mgd). Couple this finding with many operational and structural issues, and DC Water (Washington, D.C.), which owns and operates the station, decided to build a new station. This new project also offered the chance to increase capacity, enhance operation, and improve the building aesthetics.
机译:杨树点泵站自1915年以来操作在华盛顿特区。流测试几年前,车站,设计容量为170300 m ~ 3 / d (45 mgd),只能泵166160 m ~ 3 / d (43.9 mgd)。这一发现与许多操作和结构水问题,直流(华盛顿特区)拥有并经营着车站,决定建立一个新车站。机会增加容量,增强操作,和完善建筑美学。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号