...
【24h】

PROJECTS

机译:项目

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Madison (Wis.) Water Utility (MWU) unveiled its newly reconstructed Well No. 7. The reconstructed well improves water quality, pumping station reliability, and fire protection capacity for Madison residents. Well No. 7 serves as an essential part of the City of Madison's overall water supply system, providing water to more than 10,000 residents annually. Originally constructed in 1939, Well No. 7 was state-of-the-art then with a 511 -m~3 (135,000-gal) reservoir and a facility capacity of 7.95 m~3/min (2100 gal/min). The well house contained one booster pump, which along with the well pump discharge, was located below grade. This configuration posed a problem with the Wisconsin Department of Natural Resources code. Being below ground also increased the potential for contamination, should the basement flood. The water previously found in the well contained elevated levels of manganese and iron that resulted in colored water events and customer complaints.
机译:威斯康辛州的麦迪逊()。新7号重建。重构改善水质,泵站可靠性和防火麦迪逊居民的能力。麦迪逊市的一个重要组成部分整体供水系统,提供水每年超过10000名居民。建于1939年,7号最先进的511 m ~ 3(135000 -加)水库和设施能力7.95米~ 3 /分钟(2100加仑/分钟)。包含一个升压泵,随着泵出口,位于年级以下。这个配置提出了一个问题威斯康辛州自然资源部门代码。在地下也增加了潜在的对于污染,应该地下室洪水。水包含先前发现的好高浓度的锰和铁导致颜色的水事件和客户投诉。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号