During a March 2011 thunderstorm, operators at the Hill Canyon Wastewater Treatment Plant (Thousand Oaks, Calif.) noticed the facility's hydraulic capacity was not what it should be- Restoring the full 189-m~3/d (50-mgd) flow required figuring out what blocked the pipe and crafting a solution to overcome it. After a half-day of thunderstorms, Hill Canyon's flow - normally 38,000 m~3/d (10 mgd) - approached 113,000 m~3/d (30 mgd). During this period operators discovered that the facility's hydraulic capacity was only about 68,000 m~3/d (18 mgd) - the excess flow was sent to emergency retention basins.
机译:在2011年3月一个风雨交加的日子,运营商的山峡谷污水处理厂(几千加州橡树)注意到设备的液压能力并不是它应该恢复满189米~ 3 / d (50-mgd)流所需的计算什么堵塞了管道和制定一个解决方案为了克服它。雷暴,山峡谷的流动——正常38000米~ 3 / d (10 mgd)——接近113000 m ~ 3 / d(30 mgd)。只是设备的液压能力约68000米~ 3 / d (mgd) 18日-流量限制发送到紧急保留盆地。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号