...
首页> 外文期刊>Journal of irrigation engineering and rural planning >Drainage improvement planning in a low-flat area in Vietnam using unsteady flow model
【24h】

Drainage improvement planning in a low-flat area in Vietnam using unsteady flow model

机译:使用非恒定流模型的越南低洼地区排水改善计划

获取原文
获取原文并翻译 | 示例
           

摘要

The objective of this study is to propose more effective measures to improve the drainage capacity in the Bac Hung Hai irrigation and drainage system, which is in the Red river delta of northern Vietnam. First, Cunge's method developed for a loopednetwork is reviewed, and a more time-saving calculation procedure is proposed. In the proposed procedure, the number of unknowns is reduced in advance, because the CPU time consumed for the matrix calculation is proportional to the 2nd to 3rd power of the number of unknowns. Therefore, this procedure is useful for solving a simultaneous linear equation system having a large number of unknowns. Second, the Bac Hung Hal area is modeled as an open channel network composed of numerous drainage channels, paddy fields, and pumps. Parameters of the model are identified through the calibration and the verification processes using two types of hydrological data for ten days in 1994 and in 1985. Using this model, more effective measures are sought with the aim of reducing damage caused by a heavy rainfall having 1/10 exceedance probability. Four feasible measures are tested to compare their effectiveness: (1) widening outlet sluices, (2) canal dredging, (3) dredging and construction of major pumping stations, and (4) dredging and installation of minor inner pumps. To calculate the area damaged by flooding, the Vietnam standard is employed, in which a flooded paddy field is such that the water depth remains more than 287 mm for more than 24 hours. Through the examination, measure (1) turns out to have no effect, but measures (3) and (4) have remarkable effects if pumping capacities are adequate.
机译:这项研究的目的是提出更有效的措施,以改善位于越南北部红河三角洲的北洪灌溉系统的排水能力。首先,回顾了为环状网络开发的Cunge方法,并提出了一种更为省时的计算程序。在建议的过程中,未知数的数量会提前减少,因为矩阵计算所消耗的CPU时间与未知数的2到3次方成正比。因此,该程序对于求解具有大量未知数的联立线性方程组非常有用。其次,巴克洪哈尔地区被建模为一个由许多排水渠,稻田和水泵组成的明渠网络。在1994年和1985年,使用两种类型的水文数据,通过校准和验证过程确定了模型参数,分别进行了10天和10天的研究。使用该模型,可以寻求更有效的措施,以减少1级暴雨造成的破坏。超出概率/ 10。测试了四种可行的措施以比较它们的效果:(1)扩宽出口水闸;(2)疏dr运河;(3)疏major和建造大型泵站;(4)疏and和安装小型内部泵。为了计算洪水造成的破坏面积,采用了越南标准,在该标准中,水淹的稻田应使水深保持超过287毫米超过24小时。通过检查,发现措施(1)无效,但如果抽水能力足够,措施(3)和(4)会产生显着效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号