...
首页> 外文期刊>Waste management & research >Modelling waste generated during construction of buildings using regression analysis
【24h】

Modelling waste generated during construction of buildings using regression analysis

机译:使用回归分析建造建筑物的造型废物

获取原文
获取原文并翻译 | 示例
           

摘要

The building industry is responsible for a large amount of waste, and the measurement and modelling of this waste could be used to develop better waste management plans. Several theoretical models explain the relationships between waste and building characteristics, but local practices may result in different behaviours. This study aimed to measure and analyse the waste generated through construction. It was based on the analysis of 18 building sites located in the region of Porto Alegre, Brazil. Waste was measured at these sites, and the results showed an average waste generation rate of 0.151 m3 nr2. A regression analysis of the collected data presented a satisfactory performance in two models. The first model was developed to explain total waste generation, including the effects of certain attributes, with an R~2 = 0.81. The changes in waste generated during construction were estimated. The second model considered time schedules and examined the effect of the construction stage on waste generation, and reached an R2 = 0.91. The model with time indicated an S-shaped relationship. The models presented satisfactory statistical parameters and could be used to produce better waste management plans in the preconstruction stage.
机译:建筑业负责大量的废物,这种废物的测量和建模可用于开发更好的废物管理计划。几种理论模型解释了浪费和建筑特征之间的关系,但局部实践可能导致不同的行为。本研究旨在衡量和分析通过施工产生的废物。它基于位于巴西波特·阿勒格雷地区的18个建筑工地的分析。在这些位点测量废物,结果表明平均废物产生率为0.151m 3 NR 2。对收集数据的回归分析在两种模型中提出了令人满意的性能。第一种模型是开发的,以解释总废物产生,包括某些属性的影响,R〜2 = 0.81。估计建设期间产生的废物的变化。第二种模型考虑了时间表并检查了施工阶段对废物产生的影响,达到了R2 = 0.91。具有时间的模型表示了S形关系。模型呈现令人满意的统计参数,可用于在预构建阶段产生更好的废物管理计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号