...
首页> 外文期刊>Waste management & research >An estimation framework for building information modeling (BIM)-based demolition waste by type
【24h】

An estimation framework for building information modeling (BIM)-based demolition waste by type

机译:按类型划分的基于建筑信息模型(BIM)的拆迁废物的估算框架

获取原文
获取原文并翻译 | 示例
           

摘要

Most existing studies on demolition waste (DW) quantification do not have an official standard to estimate the amount and type of DW. Therefore, there are limitations in the existing literature for estimating DW with a consistent classification system. Building information modeling (BIM) is a technology that can generate and manage all the information required during the life cycle of a building, from design to demolition. Nevertheless, there has been a lack of research regarding its application to the demolition stage of a building. For an effective waste management plan, the estimation of the type and volume of DW should begin from the building design stage. However, the lack of tools hinders an early estimation. This study proposes a BIM-based framework that estimates DW in the early design stages, to achieve an effective and streamlined planning, processing, and management. Specifically, the input of construction materials in the Korean construction classification system and those in the BIM library were matched. Based on this matching integration, the estimates of DW by type were calculated by applying the weight/unit volume factors and the rates of DW volume change. To verify the framework, its operation was demonstrated by means of an actual BIM modeling and by comparing its results with those available in the literature. This study is expected to contribute not only to the estimation of DW at the building level, but also to the automated estimation of DW at the district level.
机译:现有的大多数关于拆卸废物量化的研究都没有官方标准来估算拆卸废物的数量和类型。因此,在现有文献中使用一致的分类系统估算DW存在局限性。建筑信息建模(BIM)是一种技术,可以生成和管理从设计到拆除的整个建筑生命周期中所需的所有信息。然而,关于其在建筑物的拆除阶段中的应用一直缺乏研究。为了制定有效的废物管理计划,应从建筑设计阶段开始估算DW的类型和数量。但是,缺少工具阻碍了早期估计。这项研究提出了一个基于BIM的框架,该框架可在早期设计阶段估算DW,以实现有效且简化的计划,处理和管理。具体而言,将韩国建筑分类系统中的建筑材料输入与BIM库中的建筑材料进行匹配。基于此匹配积分,通过应用重量/单位体积因子和DW体积变化率来计算按类型划分的DW估算值。为了验证该框架,通过实际的BIM建模以及将其结果与文献中的结果进行了比较,证明了其操作。预期这项研究不仅有助于建筑物级别的DW估计,而且有助于地区级别的DW的自动估计。

著录项

  • 来源
    《Waste management & research》 |2017年第12期|1285-1295|共11页
  • 作者单位

    Innovative Durable Building and Infrastructure Research Center, Hanyang University, Ansan, South Korea;

    School of Architecture, Civil, Environmental and Energy Engineering, Kyungpook National University, South Korea;

    School of Architecture, Civil, Environmental and Energy Engineering, Kyungpook National University, South Korea;

    Department of Architectural Engineering, Dankook University, Yongin, South Korea;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Building information modeling; demolition waste; estimation by type; framework;

    机译:建筑信息建模;拆除废物;按类型估算;构架;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号