...
首页> 外文期刊>Waste management & research >Value stream mapping for identification and assessment of material waste in construction: A case study
【24h】

Value stream mapping for identification and assessment of material waste in construction: A case study

机译:价值流图用于建筑材料废物的识别和评估:一个案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

Construction sites are plagued with numerous problems, such as improper planning and management, high amounts of waste generation and low awareness of waste reduction. Construction and demolition waste literature provides several best practises and prescriptive strategies that help minimise waste during construction. However, it lacks in the systematic identification and minimisation approach of all possibilities of waste. Therefore, studies focusing on principles and tools that help systematically analyse the inefficiencies of on-site processes leading to waste generation and philosophies addressing waste minimisation are necessary. As eliminating waste is one of the key lean principles, this article discusses the need and importance of integrating the lean construction with the construction and demolition waste management. This article aims to estimate and assess the causes of waste generation in a high-rise building construction through a case study in Chennai city (India) using value stream mapping, a key lean construction tool. Onsite monitoring and measurement were performed to quantify the amount of waste generated. A waste generation rate of 66.26 kg m(-2) was identified, of which concrete, cement mortar and brick waste represented almost 90% of the total construction waste. Direct observation and interviews of site personnel were conducted to understand the causes of waste generation. A strategic framework has been proposed to improve construction and demolition waste minimisation depicting the synergy of combining lean construction principles with construction and demolition waste management strategies. The proposed framework helps in the systematic identification, assessment and minimisation of on-site construction waste generation.
机译:建筑工地面临许多问题,例如规划和管理不当,产生大量废物以及对减少废物的认识不足。建筑和拆除废物文献提供了一些最佳实践和规范性策略,可帮助最大程度地减少建筑过程中的废物。但是,它缺乏所有浪费可能性的系统识别和最小化方法。因此,有必要针对有助于系统地分析导致废物产生的现场过程的低效率的原理和工具进行研究,并提出解决废物最小化的方法。由于消除浪费是关键的精益原则之一,因此本文讨论了将精益建设与建筑和拆迁废物管理相结合的必要性和重要性。本文旨在通过使用价值流图(一种精益施工工具)在印度金奈市进行的案例研究,评估和评估高层建筑施工中产生废物的原因。进行现场监测和测量以量化产生的废物量。确定的废物产生率为66.26 kg m(-2),其中混凝土,水泥砂浆和砖废物占建筑废物总量的近90%。对现场人员进行了直接观察和采访,以了解产生废物的原因。已经提出了改善建筑和拆除废物最小化的战略框架,该战略框架描述了将精益施工原则与建筑和拆除废物管理策略相结合的协同作用。拟议的框架有助于系统地识别,评估和最小化现场建筑垃圾的产生。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号