首页> 外文期刊>Tunnelling and underground space technology >New approach of tunnel alignment design in complex geological formations
【24h】

New approach of tunnel alignment design in complex geological formations

机译:复杂地质构造中隧道走线设计的新方法

获取原文
获取原文并翻译 | 示例
           

摘要

A new railway line of about 17 km length was planned between Dongbaeksan and the neighboring town Dokye to improve the existing decrepit railway system. New line about 18 km of the distance will almost be in circular alignment tunnels owing to the difference of elevation about 380 m. Since the geology of the area is rather unusual compared to the normal in South Korea, extensive geological investigations have been carried out to prepare geological maps and profiles along the planned tunnel routes. The tunnel will almost be in sedimentary rock formations, such as limestone, sandstone, shale, coal, etc. and be near abandoned mines. Various rock formations have the complicated, altered those rocks, but are well developed with laminated formations. Each rock formations have been classified using the Q-system and the cost of tunnel excavation, support has been estimated and compared for three alternative lines in the design stage. Based on these estimates, the final route of the railway line was chosen.
机译:计划在冬柏山和邻近的小镇多基之间修建一条长约17公里的新铁路线,以改善现有的破旧铁路系统。由于高度差约380 m,距离约18 km的新线几乎将位于圆形对准隧道中。由于该地区的地质情况与韩国的正常情况相比非常罕见,因此已经进行了广泛的地质调查,以沿计划的隧道路线绘制地质图和剖面。该隧道将几乎位于沉积岩层中,例如石灰石,砂岩,页岩,煤等,并位于废弃矿井附近。各种岩层具有复杂的岩石,使这些岩石发生了变化,但利用层状地层发展得很好。已使用Q系统对每个岩层进行了分类,并在设计阶段对隧道开挖的成本进行了估算,并比较了三种替代管线的支护性。基于这些估计,选择了铁路的最终路线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号