...
首页> 外文期刊>Tunnelling and underground space technology >Calculation models based on monitoring during tunnel construction
【24h】

Calculation models based on monitoring during tunnel construction

机译:隧道施工中基于监控的计算模型

获取原文
获取原文并翻译 | 示例
           

摘要

Tunnelling projects are technologically challenging projects. Measurements are performed to control settlements and/or to control the drilling process. However, these measurements can be used for more than just control. This paper shows that analyzing the results of the measurements and modelling with relatively simple calculation models can lead to new insights in the tunnelling process and possible failure mechanism. The construction of bored tunnels started only recently in The Netherlands, in the nineties of the last century. Up to then it was believed that the soft soil in The Netherlands was not suitable for a cost effective construction of bored tunnels. To acquire knowledge on boring tunnels in the soft soil conditions present it was decided to conduct monitoring campaigns on up-coming tunnel projects. The paper describes some measurements that led to a new or better description of processes that occur during tunnelling.
机译:隧道项目是技术挑战性项目。执行测量以控制沉降和/或控制钻孔过程。但是,这些测量不仅可以用于控制。本文表明,使用相对简单的计算模型来分析测量结果和建模可以在挖掘过程和可能的破坏机理方面带来新的见解。钻孔隧道的建设直到上世纪90年代才在荷兰开始。直到那时,人们一直认为荷兰的软土不适合用于具有成本效益的钻孔隧道建设。为了获得有关目前在软土条件下的隧道掘进的知识,决定对即将进行的隧道项目进行监测。本文描述了一些测量结果,这些测量结果导致对隧道期间发生的过程进行了新的或更佳的描述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号