An application of three-dimensional analysis around a tunnel portal under construction

机译:三维分析在正在施工的隧道洞口中的应用

获取原文
获取原文并翻译 | 示例
           

摘要

Deformation of a tunnel portal during tunnel excavation is very complex, and it can affect adjacent portal structures. During the construction of the Seoul Metro Line 7, a temporary vertical shaft was constructed by cut and cover method to take out a shield machine and to excavate subsequent tunnel by New Austrian Tunneling Method. Due to the complex structure of tunnel portals, the temporary support system of the vertical shaft was expected to be subjected to an additional load during the tunnel excavation. Thus, three-dimensional analysis of the vertical shaft, including tunnel excavation process, was performed in order to ensure the safety of overall system. This paper presents behavior of the vertical shaft based on the three-dimensional numerical analysis results during the construction sequence.
机译:隧道开挖期间隧道门的变形非常复杂,并且会影响相邻的门结构。在首尔地铁7号线的建设过程中,通过切面和覆盖法构造了一个临时竖井,以取出盾构机,并通过新奥地利隧道法开挖随后的隧道。由于隧道门的结构复杂,在隧道开挖期间,竖井的临时支撑系统预计会承受额外的负荷。因此,为了确保整个系统的安全性,对竖井进行了三维分析,包括隧道开挖过程。本文基于施工顺序的三维数值分析结果,介绍了竖井的行为。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号