首页> 外文期刊>Tunnelling and underground space technology >Structural analysis of contact deficiencies in segmented lining
【24h】

Structural analysis of contact deficiencies in segmented lining

机译:分段衬砌接触缺陷的结构分析

获取原文
获取原文并翻译 | 示例
           

摘要

Several authors have described the main mechanism of formation of cracks in the segmented lining during the construction of tunnels with tunnel boring machines. The most frequent types of cracks are caused by a condition of uneven support generated by contact deficiencies between the segments. This paper analyzes the influence of these contact deficiencies over the structural behavior of the lining and the consequent damage produced. In the first part of the study, two types of finite elements used to simulate the contact deficiencies are compared and validated with a simplified analytical approach. Models are used in a parametric study that yields the relation between the structural damage and the contact deficiencies. It was found that the contact deficiencies affect the maximum load resisted by the segments. The curves that relate the resistant capacity and the contact deficiency present a similar shape for all models indicating the transition between two different failure mechanisms. This transition marks a severe reduction of the segment resistant capacity, which may be used as a reference value for the estimation of the limit contact imperfection. For imperfections above this limit, the resistant capacity of the structure reduces rapidly and the damages occur for very low load levels. It was also evidenced that the packing stiffness, the width and the thickness of the segment have a clear influence on the value of the critical contact deficiency.
机译:几位作者描述了在使用隧道掘进机建造隧道的过程中,分段衬砌中裂缝形成的主要机理。裂纹的最常见类型是由于段之间接触不足而产生的支撑不均匀的情况引起的。本文分析了这些接触缺陷对衬砌结构行为的影响以及由此产生的损坏。在研究的第一部分中,使用简化的分析方法比较和验证了两种用于模拟接触缺陷的有限元类型。模型用于参数研究中,从而得出结构损伤与接触缺陷之间的关系。已经发现,接触缺陷会影响各段所承受的最大负载。对于所有模型而言,与电阻容量和接触缺陷相关的曲线都具有相似的形状,表明了两种不同失效机制之间的过渡。该过渡标志着耐分段性能力的严重降低,其可用作估计极限接触缺陷的参考值。对于超过此极限的缺陷,结构的抵抗力会迅速降低,并且在非常低的负载水平下会发生损坏。还证明了填料的刚度,段的宽度和厚度对临界接触缺陷的值有明显的影响。

著录项

  • 来源
    《Tunnelling and underground space technology》 |2011年第6期|p.734-749|共16页
  • 作者单位

    Departamento de lngenieria de la Construction, E.T.S. Ingenieros de Caminos, Canales y Puertos, Universidad Politecnica de Cataluna, Jordi Girona Salgado 1-3,Modulo C1, Despacho 202, 08034 Barcelona, Spain;

    Deparcment of Design and Construction, Structural and Building Engineering, Concrete Structures, TU Delft, Stevin Il-North 2.02, Delft 2600, The Netherlands;

    Deparcment of Design and Construction, Structural and Building Engineering, Concrete Structures, TU Delft, Stevin Il-North 2.02, Delft 2600, The Netherlands;

    Departamento de lngenieria de la Construction, E.T.S. Ingenieros de Caminos, Canales y Puertos, Universidad Politecnica de Cataluna, Jordi Girona Salgado 1-3,Modulo C1, Despacho 202, 08034 Barcelona, Spain;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    tolerance; cracks; segmented lining; uneven support; contact deficiencies;

    机译:公差;裂纹;衬里分段;支撑不均匀;接触缺陷;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号