...
首页> 外文期刊>Tunnelling and underground space technology >Budget allocation and rehabilitation plans for water systems using simulation approach
【24h】

Budget allocation and rehabilitation plans for water systems using simulation approach

机译:使用模拟方法的水系统预算分配和恢复计划

获取原文
获取原文并翻译 | 示例
           

摘要

The challenge of funding renewal plans for water networks is not only in financing but in scheduling as well. Therefore, there is an essential need to prioritize the allocation of funds (budget) to candidate projects, to select the optimal rehabilitation alternative(s), and to develop short and long-term rehabilitation plans for the entire network. A simulation-based priority index (PI) model is developed using an integrated analytic hierarchy process (AHP)/multi-attribute utility theory (MAUT). Qualitative data are collected from practitioners across North America and water network data are collected from two main municipalities in Canada. Two procedures of selecting rehabilitation alternatives (PSRAs) are employed including (1) breakage rate and (2) condition assessment. An automated web-based budget allocation index (BAI-Prioritizer) is developed to prioritize budget allocation to various water network projects. This paper presents the process of developing that web-based decision support tool. The developed PI model assists in building a renewal plan for a water network. The developed model and methodology are applied to two case studies in order to demonstrate their capabilities. The developed research is relevant to researchers and practitioners (municipal engineers, consultants, and contractors) in order to support decisions, prioritize water mains, and plan for budget allocation.
机译:为供水网络的更新计划提供资金的挑战不仅在融资方面,而且在调度方面。因此,迫切需要优先考虑对候选项目的资金分配(预算),选择最佳的康复方案,并为整个网络制定短期和长期的康复计划。使用集成的层次分析法(AHP)/多属性效用理论(MAUT)开发了基于仿真的优先级索引(PI)模型。从北美的从业人员那里收集定性数据,从加拿大的两个主要城市收集水网络数据。采用两种选择康复替代方案的程序,包括(1)破损率和(2)状况评估。开发了基于网络的自动预算分配指数(BAI-Prioritizer),以优先分配给各个供水网络项目的预算。本文介绍了开发基于Web的决策支持工具的过程。开发的PI模型有助于建立供水网络的更新计划。所开发的模型和方法论应用于两个案例研究,以证明其功能。这项发达的研究与研究人员和从业人员(市政工程师,顾问和承包商)相关,以支持决策,确定水管优先次序并计划预算分配。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号