...
首页> 外文期刊>Tunnelling and underground space technology >Planning the handling of tunnel excavation material - A process of decision making under uncertainty
【24h】

Planning the handling of tunnel excavation material - A process of decision making under uncertainty

机译:规划隧道开挖物料的处理-不确定情况下的决策过程

获取原文
获取原文并翻译 | 示例
           

摘要

Success in tunneling nowadays also depends on a sustainable tunnel design, which considers social, environmental, and economic issues. Planning the handling of excavated materials for a tunnel construction project will possibly avoid waste deposits, save mineral resources as well as energy, and reduce some of the project costs. Hence, planning the handling of excavation materials contributes to a sustainable tunnel design. However, this planning process is affected by many uncertainties and, thus, is a challenge. This paper introduces an approach, which uses the Decision Aids for Tunneling (DAT), a computer based tool, to assess uncertainties affecting tunnel excavation material handling (TEMH). In this approach the emphasis is placed on representing the individual steps in the material handling process starting with excavation and ending with the reuse or final depositing of the material. An application to a tunnel construction project, namely a part of contract section Wolf of the Brenner Base Tunnel, concludes this paper. The results obtained in such simulations can be used for decision making and can optimize the design of a tunnel construction project.
机译:如今,隧道技术的成功还取决于可持续的隧道设计,该设计考虑了社会,环境和经济问题。计划对隧道建设项目的挖掘材料进行处理将可能避免废物沉积,节省矿产资源和能源,并减少一些项目成本。因此,规划开挖材料的处理有助于可持续的隧道设计。但是,该计划过程受许多不确定因素的影响,因此是一个挑战。本文介绍一种方法,该方法使用基于计算机的工具隧道决策辅助工具(DAT)来评估影响隧道挖掘材料处理(TEMH)的不确定性。在这种方法中,重点放在代表物料处理过程中的各个步骤,这些步骤从挖掘开始,到物料的重复使用或最终沉积结束。本文总结了在隧道建设项目中的应用,即Brenner Base隧道的合同部分Wolf的一部分。在这种模拟中获得的结果可用于决策,并可优化隧道建设项目的设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号