首页> 外文期刊>Tunnelling and underground space technology >Probabilistic estimation of ground condition and construction cost for mountain tunnels
【24h】

Probabilistic estimation of ground condition and construction cost for mountain tunnels

机译:山区隧道地面条件和施工成本的概率估计

获取原文
获取原文并翻译 | 示例
           

摘要

An innovative methodology for the probabilistic estimation of ground condition and construction cost is proposed in this article, which is an integration of the geology prediction approach based on Markov process and the cost variance analysis based on work breakdown structure. The former one provides the probabilistic description of ground classification along tunnel alignment according to the geology information revealed from boring holes. The latter one provides the probabilistic description of expected cost for each interested operation according to the survey feedbacks among practitioners. Then an engineering application to Chuanshi Tunnel is well presented to demonstrate how the ground condition and the construction cost are estimated in a quantitative and probabilistic way. It facilitates both the owners and the contractors to be aware of the risk they should carry before construction, and it is meaningful for both tendering and bidding.
机译:本文提出了一种创新的地面条件和施工成本概率估计方法,该方法将基于马尔可夫过程的地质预测方法与基于工作分解结构的成本方差分析相结合。前者根据从钻孔中揭示的地质信息提供了沿隧道走线的地面分类的概率描述。后者根据从业者之间的调查反馈提供了每个感兴趣的操作的预期成本的概率描述。然后很好地介绍了川石隧道的工程应用,以演示如何定量和概率地估算地面条件和建设成本。它使业主和承包商都知道在施工前应承担的风险,这对于招标和投标都具有重要意义。

著录项

  • 来源
    《Tunnelling and underground space technology》 |2014年第5期|175-183|共9页
  • 作者单位

    College of Civil Engineering, Fuzhou University, Fuzhou 350108, China,State Key Laboratory of Mine Disaster Prevention and Control, Shandong University of Science and Technology, Qingdao 266510, China;

    College of Civil Engineering, Fuzhou University, Fuzhou 350108, China;

    State Key Laboratory of Mine Disaster Prevention and Control, Shandong University of Science and Technology, Qingdao 266510, China,Faculty of Engineering, Nagasaki University, Nagasaki 852-8521, Japan;

    College of Civil Engineering, Tongji University, Shanghai 200092, China;

    College of Civil Engineering, Tongji University, Shanghai 200092, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Mountain tunnel; Geology prediction approach; Markov process; Cost variance analysis; Work breakdown structure;

    机译:山区隧道;地质预测方法;马尔可夫过程成本差异分析;工作分解结构;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号