Study on splitting failure in rock masses by simulation test, site monitoring and energy model

机译:通过模拟试验,现场监测和能量模型研究岩体破裂破坏

获取原文
获取原文并翻译 | 示例
           

摘要

To study the phenomenon of splitting failure in the rock mass adjacent to an underground hydro-power station excavation in a region of high initial stresses, both laboratory simulation tests and site monitoring were undertaken. Concurrent with the excavation design and monitoring, an energy dissipation model was formulated. Back analysis was performed on the monitored site data obtained during excavation and construction. For study in the laboratory, large specimens were designed using rock-like materials. Using a true triaxial state test condition, one side of the specimen was unloaded to model the exposed cavern wall of the excavation. In the experimental model, rock splitting failure was observed. During the excavation (construction site), monitoring instruments were installed in boreholes in the cavern wall. Sliding micrometer, electrical resistivity tomography equipment and a borehole TV camera were employed to monitor the effects of the excavation. Back analysis using the deformation of the surrounding rock mass was carried out. The deformation and the depth of the splitting area in the surrounding rock mass after final excavation were predicted using the energy dissipation model and also by an alternate prediction formula for the splitting depth previously proposed by the authors. The correlation of measurements and predicted results was reasonably good.
机译:为了研究在高初始应力区域内地下水电站开挖附近的岩体中的劈裂破坏现象,进行了实验室模拟测试和现场监测。在进行开挖设计和监测的同时,建立了能量耗散模型。对在开挖和施工过程中获得的监测现场数据进行了反分析。为了在实验室中进行研究,使用岩石样材料设计了大型标本。使用真实的三轴状态测试条件,将样品的一侧卸载,以对挖掘的裸露洞壁建模。在实验模型中,观察到岩石破裂破坏。在开挖期间(施工现场),监测仪器安装在洞壁的钻孔中。滑动测微仪,电阻层析成像设备和井眼电视摄像机用于监测开挖的效果。进行了利用围岩变形的反分析。使用能量耗散模型以及作者先前提出的裂隙深度的替代预测公式,对最终开挖后围岩中裂隙区域的变形和深度进行了预测。测量值和预测结果的相关性相当好。

著录项

  • 来源
    《Tunnelling and underground space technology》 |2014年第3期|152-164|共13页
  • 作者单位

    State Key Laboratory of Ceomechanics and Ceotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan, Hubei 430071, China,Geotechnical and Structural Engineering Research Centre, Shandong University, Jinan, Shandong 250061, China;

    State Key Laboratory of Ceomechanics and Ceotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan, Hubei 430071, China,Geotechnical and Structural Engineering Research Centre, Shandong University, Jinan, Shandong 250061, China;

    School of Civil Engineering, Shandong Jianzhu University, Jinan, Shandong 250101, China;

    Geotechnical and Structural Engineering Research Centre, Shandong University, Jinan, Shandong 250061, China;

    Geotechnical and Structural Engineering Research Centre, Shandong University, Jinan, Shandong 250061, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Underground cavern group; Splitting failure; Simulating test; Site monitoring; Energy dissipation; Back analysis;