Voids behind the liner may be created during or after construction of the tunnel liner because of insufficient backfilling, poor workmanship, water erosion or gravity. Survey on a number of tunnels that suffered collapse while in service showed that voids behind the liner were the main factors for the failure. The paper provides a better understanding of the stress redistribution that occurs in the rock mass around a void and quantifies the stresses induced in the liner due to the voids. The effects of cavities or voids due to different size, location and depth are explored numerically through an elasto-plastic finite element analyses. Other factors such as lining flexibility, in situ stresses and tunnel shape are also investigated. The analyses show that voids can induce a large change of the thrust and bending moment in the liner with respect to the case of a liner without a void. The bending moment can even reverse sign, which may result in cracks in the lining or even failure. The voids also change the distribution of the rock stresses around the tunnel, which may result in progressive failure of the rock and rock falls that can lead to additional damage to the liner. Because the void forms behind the liner, it may not be readily detected until significant damage to the liner has been produced, generally in the form of severe cracking, spalling or even failure.
机译:由于回填不足,工艺差,水蚀或重力,在隧道衬砌施工期间或之后可能会在衬砌后面产生空隙。对许多在使用中遭受坍塌的隧道进行的调查显示,衬砌后面的空隙是破坏的主要因素。本文提供了对孔隙周围岩体中发生的应力重新分布的更好理解,并量化了由于孔隙而在衬砌中引起的应力。通过弹塑性有限元分析,对由于大小,位置和深度不同而产生的孔洞或空隙的影响进行了数值研究。还研究了其他因素,如衬砌柔性,原地应力和隧道形状。分析表明,相对于没有空隙的衬里,空隙会引起衬里的推力和弯矩的较大变化。弯矩甚至可以使符号反转,这可能导致衬里出现裂纹甚至失效。空隙还会改变隧道周围岩石应力的分布,这可能会导致岩石的逐渐破坏和岩石崩塌,从而可能进一步损害衬砌。由于在衬套后面形成了空隙,因此直到衬套产生明显损坏(通常以严重的开裂,剥落或什至失效的形式)后,才能轻易检测到空隙。

著录项

  • 来源
    《Tunnelling and underground space technology》 |2014年第2期|263-276|共14页
  • 作者单位

    Key Laboratory of Geotechnical & Underground Engineering of Ministry of Education, Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China;

    Key Laboratory of Geotechnical & Underground Engineering of Ministry of Education, Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China;

    Key Laboratory of Geotechnical & Underground Engineering of Ministry of Education, Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China;

    Purdue University, West Lafayette, IN, USA;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Tunnel; Liner; Voids; Void-induced stress redistribution; Liner damage;

    机译:隧道;衬垫;空隙;空隙引起的应力再分布;衬板损坏;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号