Investigations of the sequential excavation and reinforcement of an underground cavern complex using the discontinuous deformation analysis method

机译:非连续变形分析法研究地下洞室群的顺序开挖与加固

获取原文
获取原文并翻译 | 示例
           

摘要

Two modifications are made to enable the use of the discontinuous deformation analysis (DDA) method to investigate the sequential construction of an underground cavern complex. One modification is the "block birth and death" approach. With the aid of a boundary block searching algorithm, this approach excavates the blocks in any closed domain step by step and is verified by a DDA example. The other modification is an updating algorithm of the rock bolt called the dull-reactivating method. In this new algorithm, the coordinates of the ending endpoints of the dull rock bolts are regularly updated and the corresponding rock bolts in the sequential reinforcement region are reactivated. The initial geostress field and the sequential construction of the underground cavern complex of the Dagangshan hydropower station in Southwest China are simulated with the modified DDA method. Valuable results are obtained by analysing the displacement, stress and rock bolt force. In the construction processes, the blocks around each cavern form a bearing capacity system to prevent the block deformation, and the rock bolts jointly support the stress release as a system. At the sidewalls of the main machine building and the downstream side wall of the tail surge chamber, the blocks cut by joints with a high dip angle suffer a strong stress release, and the tension forces of the several rock bolts are so large that they should be noticed, which provides a basis for the construction guidance of the project. (C) 2015 Elsevier Ltd. All rights reserved.
机译:进行了两项修改,以允许使用不连续变形分析(DDA)方法来研究地下洞室群的顺序施工。一种修改是“阻止生与死”方法。借助边界块搜索算法,该方法逐步挖掘了任何封闭域中的块,并通过DDA示例进行了验证。另一修改是岩栓的更新算法,称为钝化重新激活方法。在这种新算法中,沉闷岩栓末端端点的坐标会定期更新,并且顺序钢筋区域中的相应岩栓会重新激活。用改进的DDA方法模拟了西南大港山水电站的初始地应力场和地下洞室群的顺序施工。通过分析位移,应力和锚杆力可获得宝贵的结果。在施工过程中,每个洞室周围的砌块形成一个承载力系统,以防止砌块变形,而岩栓作为一个系统共同支撑应力释放。在主机房的侧壁和尾部调压室的下游侧壁处,被大倾角的接缝切割的砌块承受着很大的应力释放,并且几个锚杆的拉力太大,以至于它们应该注意,这为项目的施工指导提供了基础。 (C)2015 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号