Tunnelling undercrossing existing live MRT tunnels

机译:穿越现有的现役捷运隧道的隧道

获取原文
获取原文并翻译 | 示例
           

摘要

In conjunction with the government of Singapore's vision to have efficient and extensive Mass Rapid Transit (MRT) system across Singapore Island, more and more rail tunnels are planned to be constructed in close proximity to sensitive buildings and infrastructures in recent years. This being a particular challenge for major infrastructure works in the urban environment. In contract C937 of Downtown Line Stage 3 (DTL3), twin bored tunnels connect Fort Canning station to Bencoolen Station, under Fort Canning Hill, with the alignment overcrossing the existing North East Line (NEL) rail tunnel, undercrossing North South Line (NSL) and Circle Line (CCL) with clear distance of less than one bored tunnel diameter. This inevitably poses great challenges to tunnelling over and under existing live tunnels without disruption to daily operation of MRT. Further compounding the challenge is the ground condition comprising of Jurong Formation steeply variable sedimentary deposits transitioning into Fort Canning Boulder Bed a colluvial deposit of quartzite boulders in a stiff clay matrix. To successfully negotiate this challenge, requires all involved parties to make contributions in their areas of expertise and work as team together to ensure that the works progress smoothly and as planned. The designer provides an overall approach demonstrating that the work can be safely carried out and provides key parameters for the contractor who carries out the tunnelling with construction control, which in turn is supervised by the supervision engineers ensuring work is carried out safely. The client, who provides the vision in the first place, has overall responsibility for the work providing continuity and ensuring that the component parts of the job are co-ordinated and carried out successfully. In addition, different monitoring levels were also established to reduce the train speed if necessary and also bus bridging service as a contingency measure. This paper summarizes the approach to the tunnelling, key tunnelling parameters during undercrossing of existing live MRT tunnels, instrumentation monitoring as well as measured railway track and structure movements due to proximity tunnelling. It reflects upon the on crucial contributory factors that ensure success within the project and serves as a reference as to how engineering boundaries can be challenged underground. (C) 2016 Elsevier Ltd. All rights reserved.
机译:结合新加坡政府在整个新加坡岛上建立高效,广泛的捷运(MRT)系统的愿景,近年来,越来越多的铁路隧道计划在敏感的建筑物和基础设施附近建造。对于城市环境中的主要基础设施工程而言,这是一个特殊的挑战。在市区3号线(DTL3)合同C937中,双孔隧道将Fort Canning车站连接到Fort Canning Hill下的Bencoolen车站,路线跨越了现有的North East Line(NEL)铁路隧道,并穿越了North South Line(NSL)净距小于一个钻孔隧道直径的圆形线(CCL)。在不中断地铁的日常运营的前提下,这不可避免地给现有的活动隧道上下穿隧道带来了巨大的挑战。进一步加剧挑战的是地面条件,包括裕廊组陡峭变化的沉积物过渡到福康宁博尔德床,以及在硬质粘土基质中的石英岩巨砾的沉积沉积。为了成功地应对这一挑战,需要所有相关方在各自的专业领域做出贡献,并以团队的方式共同努力,以确保工作能够按计划顺利进行。设计人员提供了一种总体方法,证明可以安全地进行工作,并为进行施工控制的隧道承包商提供关键参数,然后由监理工程师进行监督,以确保安全地进行工作。首先提供愿景的客户对提供连续性并确保工作的各个组成部分得到协调和成功执行负有总体责任。此外,还建立了不同的监控级别,以在必要时降低列车速度,并作为应急措施采取公交桥服务。本文总结了隧道施工的方法,现有地铁捷运隧道过桥过程中的关键隧道参数,仪器监测以及由于邻近隧道施工而引起的铁路轨道和结构运动的测量。它反映了确保项目成功的关键贡献因素,并为如何挑战地下工程边界提供了参考。 (C)2016 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号