...
首页> 外文期刊>Tunnelling and underground space technology >Assessment of clay soils and clay-rich rock for clogging of TBMs
【24h】

Assessment of clay soils and clay-rich rock for clogging of TBMs

机译:评估粘土和富粘土岩石对TBM的堵塞

获取原文
获取原文并翻译 | 示例
           

摘要

Shield tunnel drives in both, overconsolidated clays soils and sedimentary rock with clay minerals, frequently suffer extremely from hindrance due to clogging. The problem of clogging can have varying degrees, from locally blocked disk cutter housings to completely clogged excavation chambers with a blocked cutterhead. The clogging risk depends on multiple mineralogical and soil-mechanical parameters. The authors have more than 15 years of experience in practice and scientific research with the problem of clay clogging of TBMs. The paper shows the occurrence and risk for clogging in varying ground types and for different machine components, summarizes the available characterization methods for the stickiness of the ground, discusses a variety of laboratory tests for the assessment of clogging potential, explains a recently developed diagram for the assessment of clogging risks for all types of tunnelling machines, and introduces a new testing scheme for the evaluation of sedimentary rocks regarding clogging. (C) 2016 Elsevier Ltd. All rights reserved.
机译:在超固结的粘土土壤和含粘土矿物的沉积岩中,盾构隧道驱动器经常由于堵塞而遭受极大的阻碍。堵塞的问题可能有不同程度,从局部堵塞的圆盘切割器外壳到完全堵塞的切割头而堵塞的挖掘腔。堵塞的风险取决于多种矿物学和土壤力学参数。作者在TBM的粘土堵塞问题方面具有超过15年的实践和科学研究经验。该文件显示了在不同地面类型和不同机器组件中发生堵塞的情况和风险,总结了地面粘性的可用表征方法,讨论了用于评估堵塞可能性的各种实验室测试,解释了最近开发的用于堵塞的图表。评估各种类型隧道掘进机的堵塞风险,并引入了一种新的测试方案来评估沉积岩的堵塞情况。 (C)2016 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号