Reliability based design optimization for a rock tunnel support system with multiple failure modes using response surface method

机译:基于响应面法的多失效模式岩石隧道支护系统可靠性优化设计

获取原文
获取原文并翻译 | 示例
           

摘要

Reliability-based design optimization (RBDO) is applied to a rock tunnel support system, considering the ground support interaction and the parametric uncertainties. Both reliability index approach (RIA) and performance measure approach (PMA) are employed as the RBDO algorithms. The first-order reliability method (FORM) and the response surface method (RSM) are used to perform the reliability analysis. The shotcrete thickness and its installation position are considered as two design variables to be optimized in an illustrative example of a circular rock tunnel. The influence of the two design variables on the reliability results is first investigated with respect to three failure modes, namely, the support capacity criterion, the tunnel convergence criterion and the rockbolt length criterion. Then, the proposed RBDO procedure is used to seek for the design variables of minimum shotcrete thickness and the optimal installation position for the rock tunnel example. The computational efficiency and stability between RIA and PMA are compared. The influences of the rock mass quality, the variation of the shotcrete thickness and the target reliability requirement on the optimized results are also investigated and discussed.
机译:考虑到地面支撑相互作用和参数不确定性,将基于可靠性的设计优化(RBDO)应用于岩石隧道支撑系统。可靠性指标方法(RIA)和性能评估方法(PMA)均被用作RBDO算法。一阶可靠性方法(FORM)和响应面方法(RSM)用于执行可靠性分析。在圆形岩石隧道的示例中,喷射混凝土的厚度及其安装位置被视为要优化的两个设计变量。首先针对三种破坏模式,即支护能力准则,隧道收敛准则和锚杆长度准则,研究了两个设计变量对可靠性结果的影响。然后,所提出的RBDO程序被用于寻找最小喷射混凝土厚度和岩石隧道实例的最佳安装位置的设计变量。比较了RIA和PMA之间的计算效率和稳定性。还研究和讨论了岩体质量,喷射混凝土厚度的变化和目标可靠性要求对优化结果的影响。

著录项

  • 来源
    《Tunnelling and underground space technology》 |2017年第11期|1-10|共10页
  • 作者单位

    Zhejiang Univ, Coll Civil Engn & Architecture, Hangzhou 310058, Zhejiang, Peoples R China;

    Zhejiang Univ, Coll Civil Engn & Architecture, Hangzhou 310058, Zhejiang, Peoples R China;

    Hohai Univ, Minist Educ Geomech & Embankment Engn, Key Lab, Nanjing, Jiangsu, Peoples R China|Monash Univ, Dept Civil Engn, Clayton, Vic 3800, Australia;

    Zhejiang Univ, Coll Civil Engn & Architecture, Hangzhou 310058, Zhejiang, Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Tunnel; RBDO; Multiple failure modes; Response surface method; FORM;

    机译:隧道;RBDO;多种破坏模式;响应面法;FORM;