首页> 外文期刊>Tunnelling and underground space technology >Performance of constructing a double-deck subway station by combining the shield method and cavern-pile method
【24h】

Performance of constructing a double-deck subway station by combining the shield method and cavern-pile method

机译:盾构法与洞室桩法相结合建设双层地铁站的性能

获取原文
获取原文并翻译 | 示例
           

摘要

A method of constructing a double-deck subway station by combining two parallel shield tunnels and the cavern pile method is presented. Taking the practical engineering of the Beijing subway as the background, numerical simulations were carried out to study enlarging construction. Mechanical and deformed performances for opening segments, important nodes, and main components of the station structure were investigated. Subsequently, a comparative analysis was performed to investigate the effects of side piles. Finally, an economic investigation was conducted to validate the practicability of the present method. This paper systematically demonstrates the applicability of the proposed method through a three-dimensional numerical simulation. The results show that it is safe and feasible to create a double-deck subway station by enlarging two parallel shield tunnels using the cavern pile method.
机译:提出了结合两条平行盾构隧道和洞室桩法建造双层地铁站的方法。以北京地铁的实际工程为背景,进行了数值模拟,以研究扩建工程。研究了开放段,重要节点和车站结构主要部件的机械性能和变形性能。随后,进行了比较分析以研究侧桩的影响。最后,进行了经济调查以验证本方法的实用性。本文通过三维数值模拟系统地证明了该方法的适用性。结果表明,利用洞桩法扩大两条平行的盾构隧道,形成双层地铁站是安全可行的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号