首页> 外文期刊>Tunnelling and underground space technology >An experimental study of the dynamic response of shield tunnels under long-term train loads
【24h】

An experimental study of the dynamic response of shield tunnels under long-term train loads

机译:长期列车荷载作用下盾构隧道动力响应的试验研究

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper, results are presented from a series of physical tests aimed at studying the influence of long-term train loads on the dynamic response of a tunnel lining and the surrounding soil. In the tests, the train loads were constantly applied at the tunnel invert by an electromagnetic shaker. The dynamic response of the tunnel lining and surrounding soil were measured initially and after 160,000, 330,000, and 600,000 loading sequences (each sequence representing the passage of a model train). The peak particle acceleration and frequency response function (FRF) of the model were calculated at each of these loading cycles. Two tunnel lining models were used in the experimental tests: stagger-jointed and uniform. The results show that the peak particle acceleration of the tunnel is amplified only after long-term train loads are applied. However, the peak particle acceleration of the soil shows an almost linear increase with loading cycles. The frequency domain results show that the dynamic characteristics of the soil could be significantly affected by the long-term train loads. Due to the variation of confining stress induced by long-term train loads, a clear 'shift' of soil FRFs with loading cycles was found. Test results also show that it is important to consider segmental joints when studying long-term train load effects on tunnel response.
机译:本文提出了一系列物理测试结果,旨在研究长期列车载荷对隧道衬砌和周围土壤动力响应的影响。在测试中,列车负载通过电磁振动器不断施加在隧道倒置处。最初以及在160,000、330,000和600,000个加载序列(每个序列代表模型火车的通过)之后,分别测量隧道衬砌和周围土壤的动力响应。在每个加载周期中计算模型的峰值粒子加速度和频率响应函数(FRF)。在实验测试中使用了两种隧道衬砌模型:交错连接和均匀。结果表明,仅在施加长期列车荷载后,隧道的峰值加速度才被放大。但是,土壤的峰值颗粒加速度随负荷循环而呈线性增长。频域结果表明,长期的列车荷载会显着影响土壤的动力特性。由于长期列车荷载引起的约束应力变化,发现土壤FRF随着荷载循环而发生明显的“移动”。测试结果还表明,在研究长期列车荷载对隧道响应的影响时,考虑分段节理很重要。

著录项

  • 来源
  • 作者单位

    Southwest Jiaotong Univ, Minist Educ, Key Lab Transportat Tunnel Engn, Chengdu 610031, Sichuan, Peoples R China;

    Southwest Jiaotong Univ, Minist Educ, Key Lab Transportat Tunnel Engn, Chengdu 610031, Sichuan, Peoples R China;

    Southwest Jiaotong Univ, Minist Educ, Key Lab Transportat Tunnel Engn, Chengdu 610031, Sichuan, Peoples R China;

    Southwest Jiaotong Univ, Minist Educ, Key Lab Transportat Tunnel Engn, Chengdu 610031, Sichuan, Peoples R China;

    Southwest Jiaotong Univ, Minist Educ, Key Lab Transportat Tunnel Engn, Chengdu 610031, Sichuan, Peoples R China;

    Southwest Jiaotong Univ, Minist Educ, Key Lab Transportat Tunnel Engn, Chengdu 610031, Sichuan, Peoples R China;

    Southwest Jiaotong Univ, Minist Educ, Key Lab Transportat Tunnel Engn, Chengdu 610031, Sichuan, Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Dynamic response; Shieldtunnels; Long-term train loads; Segment joints;

    机译:动态响应;盾构隧道;长期列车荷载;节理节点;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号