Research of surface settlement for a single arch long-span subway station using the Pipe-roof Pre-construction Method

机译:基于管棚预建法的单拱大跨度地铁站地面沉降研究

获取原文
获取原文并翻译 | 示例
           

摘要

During the construction process of the Pipe-roof Pre-construction Method (PPM), the main excavation is executed under the protection of a previously created and reliable structure, which ensures safety in construction. Moreover, PPM does not affect the road traffic, generally does not require the moving of underground pipelines, and does not cause excessive surface settlement. The Xinleyizhi Station of the Shenyang subway system is a single arch long-span structure in poor geological conditions and with a complex surrounding environment and strict requirements for construction period. After considering the problems and potential solutions, PPM was used to build this station. In order to ensure safety in construction, the whole construction process was closely monitored. The surface settlement monitoring results are studied in this paper, and the causes of settlement are analyzed. According to the field measurement, the most serious settlement occurred in the layer 1-7 pipe jacking. Because of repeated disturbance and 'shielding effect' in pipe jacking, soil displacement mode changes, and traditional Peck formula is no longer applicable. Modified Peck formula is proposed to predict settlement caused by pipe jacking, and the specific method of taking parameters values in modified Peck formula is given. Compared to the measured transverse surface settlement curve in monitoring, it is shown that the prediction results are in good agreement with the measured results.
机译:在管棚预施工法(PPM)的施工过程中,主要开挖是在先前创建的可靠结构的保护下进行的,从而确保了施工安全。而且,PPM不会影响道路交通,通常不需要移动地下管道,也不会引起过多的地面沉降。沉阳地铁系统的新列直站是单拱大跨度结构,地质条件恶劣,周围环境复杂,对施工期要求严格。在考虑了问题和潜在的解决方案之后,使用PPM建造了该站。为了确保施工安全,整个施工过程受到严格监控。研究了地表沉降监测结果,分析了地表沉降的原因。根据现场测量,最严重的沉降发生在1-7层顶管中。由于顶管过程中反复受到干扰和“屏蔽效应”,土壤位移模式发生了变化,传统的Peck公式不再适用。提出了修正的Peck公式来预测顶管引起的沉降,并给出了在修正的Peck公式中获取参数值的具体方法。与监测中测得的横向沉降曲线相比,预测结果与测得的结果吻合良好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号