...
首页> 外文期刊>Tunnelling and underground space technology >A large-scale physical model test on frozen status in freeze-sealing pipe roof method for tunnel construction
【24h】

A large-scale physical model test on frozen status in freeze-sealing pipe roof method for tunnel construction

机译:隧道冻结封顶管法冻结状态的大型物理模型试验

获取原文
获取原文并翻译 | 示例
           

摘要

The Gongbei Tunnel, the most important and difficult part in Zhuhai Link of Hong Kong-Zhuhai-Macao Bridge, faces numerous troubles because of natural and human-related factors. A new pre-supporting technique, Freeze Sealing Pipe Roof method, which combines Pipe-Roofing Method with Artificial Ground Freezing method, has been put forward and employed for the first time in China during the construction of the Gongbei Tunnel. An innovative freezing scheme is proposed by three kinds of freezing tubes (master, enhancing and limiting tubes) to cope with various conditions. A large-scale physical model test has been conducted so as to validate the freezing effect of Freeze-Sealing Pipe Roof method. The present paper focuses on the experimental set-up and results in detail, which confirms safety and rationality of the freezing scheme.
机译:拱北隧道是港珠澳大桥珠海连接线最重要,最困难的部分,由于自然和人为因素,面临许多麻烦。在拱北隧道的建设中,提出了一种将管道屋面法与人工地面冻结法相结合的冻结密封管屋面法。通过三种冷冻管(主,增强管和限制管)提出了一种创新的冷冻方案,以应对各种条件。为了验证冻结密封管屋顶法的冻结效果,已进行了大规模的物理模型测试。本文着重于实验设置和结果,这证实了冷冻方案的安全性和合理性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号