...
首页> 外文期刊>Tunnelling and underground space technology >The mechanized supporting system in tunnelling operations
【24h】

The mechanized supporting system in tunnelling operations

机译:隧道运算中的机械化支撑系统

获取原文
获取原文并翻译 | 示例
           

摘要

Tunnelling, especially those providing access and preparatory ones, is the biggest problem in the exploitation of useful minerals by longwall systems. Providing access to the deposit and then preparing it for exploitation generates high costs with minimal or no income. Shortening the time of tunnel developments through the mechanization of mining works (mining, loading, erecting support) will significantly reduce the time and costs of implementing these facilities. At present, the mining and loading process has been mechanized (roadheaders), while the issue of erecting a steel arch support or even an anchoring support is still open. In order to solve this problem, the last element of such a complex was developed at the AGH University of Science and Technology, i.e. the temporary mechanized tunnel support along with the modular installation and transport assembly. This support, together with other elements of the mine face equipment, forms the mechanized supporting system in tunnelling operations, where the fixed support is mounted behind the roadheader, enabling continuous cutting and loading.
机译:隧道,特别是那些提供访问和预备人员的隧道,是Longwall系统利用有用矿物质的最大问题。提供对押金的访问,然后准备利用,以最小或没有收入产生高成本。通过采矿工程机械化(采矿,装载,勃起支持)缩短隧道发展的时间将大大减少实施这些设施的时间和成本。目前,采矿和装载过程已被机械化(陆路主机),而竖立钢拱支撑甚至锚固支架的问题仍然是开放的。为了解决这个问题,在AGH科学和技术大学的临时机械化隧道支持以及模块化安装和运输组件中开发了这种复杂的最后一个元素。这种支撑与矿井面设备的其他元件一起形成隧道操作中的机械化支撑系统,其中固定支撑件安装在路标后面,从而能够连续切割和装载。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号