首页> 外文期刊>Tunnelling and underground space technology >A novel real-time monitoring system for the measurement of the annular grout thickness during simultaneous backfill grouting
【24h】

A novel real-time monitoring system for the measurement of the annular grout thickness during simultaneous backfill grouting

机译:一种新型实时监测系统,用于测量同时回填灌浆期间的环形灌浆厚度

获取原文
获取原文并翻译 | 示例
           

摘要

Backfill grouting is generally used to limit the ground surface settlement induced by shield tunneling. The control of this settlement constitutes a major challenge in the use of shield machines in urban areas. This control could be monitored using the ground penetrating radar (GPR) for its high precision and efficiency. This paper presents the development and use of a real-time back-fill grouting monitoring system, which is based on the integration of a new GPR monitoring system in a shield tunnel machine. The three-dimensional Finite Difference Time Domain (FDTD) was adopted to analyze the propagation of the electromagnetic waves in the backfill grouting. After verification of the use of a GPR center frequency band of 300 MHz, the system was used in real in the construction of the R3 of Jinan metro. The application showed that only 3-4 min were required for the backfill monitoring, which provided enough time to adapt the grouting process to the settlement requirements. Results also allowed establishing criteria for the evaluation of the grouting thickness. The use of this system allowed engineers to limit the tunneling-induced settlement in urban areas.
机译:回填灌浆通常用于限制屏蔽隧道诱导的地面沉降。对该解决方案的控制构成了在城市地区使用盾构机的主要挑战。可以使用地面穿透雷达(GPR)来监测该控制,以实现高精度和效率。本文介绍了实时回填充灌浆监控系统的开发和使用,基于盾构隧道机中的新GPR监测系统的集成。采用三维有限差分时域(FDTD)分析电磁波在回填灌浆中的传播。在验证使用GPR中心频带300 MHz之后,系统在济南地铁R3的建设中真实使用。该应用表明,回填监测只需要3-4分钟,这提供了足够的时间来使灌浆过程适应结算要求。结果还允许建立评估灌浆厚度的标准。使用该系统允许工程师限制城市地区的隧道诱导的结算。

著录项

  • 来源
    《Tunnelling and underground space technology》 |2020年第11期|103567.1-103567.13|共13页
  • 作者单位

    Tongji Univ Key Lab Geotech & Underground Engn Minist Educ Shanghai 200092 Peoples R China|Tongji Univ Coll Civil Engn Dept Geotech Engn Shanghai 200092 Peoples R China;

    Tongji Univ Key Lab Geotech & Underground Engn Minist Educ Shanghai 200092 Peoples R China|Tongji Univ Coll Civil Engn Dept Geotech Engn Shanghai 200092 Peoples R China;

    Tongji Univ Key Lab Geotech & Underground Engn Minist Educ Shanghai 200092 Peoples R China|Tongji Univ Coll Civil Engn Dept Geotech Engn Shanghai 200092 Peoples R China;

    Tongji Univ Sch Ocean & Earth Sci Shanghai 200092 Peoples R China;

    Guangzhou Univ Coll Civil Engn Dept Geotech Engn Guangzhou 510006 Peoples R China;

    Tongji Univ Key Lab Geotech & Underground Engn Minist Educ Shanghai 200092 Peoples R China|Tongji Univ Coll Civil Engn Dept Geotech Engn Shanghai 200092 Peoples R China;

    Univ Lille Lab Genie Civil & Geoenvironm LGCgE F-59000 Lille France;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Shield tunnelling; Ground Penetrating Radar (GPR); Grouting; GPR monitoring system; Settlements;

    机译:盾构隧道;地面穿透雷达(GPR);灌浆;GPR监测系统;定居点;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号