Assessment of the factors affecting the advance rate of the Tunnel Gerede, the longest and one of the most problematic water transmission tunnels of Turkey

机译:评估影响隧道预先速率的因素,最长和土耳其最有问题的水传输隧道之一

获取原文
获取原文并翻译 | 示例
           

摘要

The Gerede Tunnel, with approximately 31.6 km in length, is Turkeys longest water transmission tunnel as of 2018. The tunnel will transmit the water from the Gerede River to the Camlidere reservoir, providing drinking water to Ankara. The tunnel is divided into three sections as Umitkoy, Havullu and Camlidere, and excavations started in each section with separate tunnel boring machine (TBM-1, TBM-2 and TBM-3 respectively). The excavation, started in 2012, completed within 508 days without significant problem in the Umitkoy section having 9588 m length. In Havullu and Camlidere sections, TBMs were blocked due to high pressure water and also material ingression. This caused the progress in the tunnel to be delayed repeatedly. In addition, the harsh conditions forced to be drilled upwards after 6061th m in the Havullu section, and to be drive with another type of TBM after 7235 m in the Camlidere section. Finally, the last 8821 m was completed with the EPB machine.The daily average advance rates of TBM-1, TBM-2 and TBM-3 are respectively 18.77 m, 6.13 m and 9.37 m. For the modified EPB type TBM-4, which takes over the task of TBM-3 and TBM-2 in the last 8821 m, the advance rate is 9.56 m/day. According to the analysis, the tectonic structure, hydrogeology and TBM type are the most effective parameters on the advance rate of the Gerede Tunnel. Experiences obtained from the tunnel show that geological-tectonic-hydrogeological studies should be carried out in detail in project phase and TBM selection according to these conditions, particularly against collapse and high pressure water ingress, have vital importance.
机译:Gerede隧道的长度约为31.6公里,是火鸡最长的水传输隧道截至2018年。隧道将从Gerede河流到Camlidere水库的水,为Ankara提供饮用水。隧道分为三个部分,作为Umitkoy,Havullu和Camlidere,并且在每个部分开始的挖掘,分别具有独立的隧道镗床(TBM-1,TBM-2和TBM-3)。挖掘,于2012年开始,在508天内完成,无uitkoy部分长度为9588米。在Havullu和Camlidere Sections中,由于高压水和材料进入而被阻塞。这导致隧道中的进展重复延迟。此外,在HAVULLU部分的6061M中,苛刻的条件被迫在6061m后向上钻孔,并在凸轮线条部分中的7235米后用另一种类型的TBM驱动。最后,最后8821米用EPB机器完成。TBM-1,TBM-2和TBM-3的每日平均提高率分别为18.77米,6.13米和9.37米。对于修改的EPB型TBM-4,它在最后8821米中接管TBM-3和TBM-2的任务,预先速率为9.56米/天。根据分析,构造结构,水文地质和TBM类型是Gerede隧道的先进率最有效的参数。从隧道获得的经验表明,根据这些条件,应当在项目阶段和TBM选择中详细进行地质 - 构造 - 水文地质研究,特别是针对崩溃和高压水入口,具有至关重要的重要性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号