...
首页> 外文期刊>Tunnelling and underground space technology >Visibility graph analysis on time series of shield tunneling parameters based on complex network theory
【24h】

Visibility graph analysis on time series of shield tunneling parameters based on complex network theory

机译:基于复杂网络理论的盾构隧道参数的可见性图分析

获取原文
获取原文并翻译 | 示例
           

摘要

Shield tunneling operation affects project scheduling, cost estimation, and safety risk during metro construction. Given the importance of this process, tunnel engineers should understand the complexities of shield tunneling parameters. This study addresses the characteristics of shield tunneling parameters by introducing a visibility graph model implemented in a complex network of shield tunneling in metro construction. Time series data are collected for the analysis of six parameters generated in each segment ring tunneling cycle. These parameters are total thrust, torque, penetration rate, rotation rate, advance speed, and working chamber pressure. Bridging time series and the complex network with visibility graph algorithm indicates that all degree distributions of the construct networks follow the power law, establishing the scale-free time series of the parameters. Small-world features and hierarchical structures also indicate that the fluctuation and variance of the parameters are attracted, limited, or affected by a previous shield operation of segment rings. In addition, findings reveal turning points in the parameters' time series with vital node identification based on complex network analysis. Implications relevant for shield operators and managers are proposed to improve shield tunneling performance, efficiency, and safety.
机译:屏蔽隧道操作会影响地铁建设期间的项目调度,成本估计和安全风险。鉴于这一进程的重要性,隧道工程师应该了解盾构隧道参数的复杂性。本研究通过在地铁建设中引入在盾构隧道网络复杂网络中实现的可见性图形模型来解决屏蔽隧道参数的特征。收集时间序列数据,用于分析每个段环隧道循环中产生的六个参数。这些参数是总推力,扭矩,穿透速率,旋转速率,先进速度和工作室压力。桥接时间序列和具有可见性图形算法的复杂网络表示构造网络的所有程度分布遵循权力法,建立了无尺度的参数系列序列。小世界特征和分层结构还表明参数的波动和方差被段环的先前屏蔽操作所吸引,有限或受到影响。此外,研究结果显示参数的时间序列中的转折点与基于复杂网络分析的重要节点识别。提出了对盾牌运营商和经理相关的影响,以改善屏蔽隧道性能,效率和安全性。

著录项

  • 来源
    《Tunnelling and underground space technology》 |2019年第7期|10-24|共15页
  • 作者单位

    Huazhong Univ Sci & Technol Dept Construct Management Sch Civil Engn & Mech Wuhan Hubei Peoples R China|Hubei Engn Res Ctr Virtual Safe & Automated Const Wuhan Hubei Peoples R China|Univ Maryland Dept Civil & Environm Engn College Pk MD 20742 USA;

    Huazhong Univ Sci & Technol Dept Construct Management Sch Civil Engn & Mech Wuhan Hubei Peoples R China|Hubei Engn Res Ctr Virtual Safe & Automated Const Wuhan Hubei Peoples R China;

    Huazhong Univ Sci & Technol Dept Construct Management Sch Civil Engn & Mech Wuhan Hubei Peoples R China|Hubei Engn Res Ctr Virtual Safe & Automated Const Wuhan Hubei Peoples R China;

    Univ Maryland Dept Civil & Environm Engn College Pk MD 20742 USA|Polish Acad Sci Inst Theoret & Appl Informat Gliwice Poland|Chaoyang Univ Technol Taichung Taiwan;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Shield tunneling; Parameter; Complex network; Visibility graph; Time series; Metro construction;

    机译:屏蔽隧道;参数;复杂网络;可见性图;时间序列;地铁建设;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号