Response of the ground and adjacent end-bearing piles due to side-by-side twin tunnelling in compound rock strata

机译:复合岩层中并排双隧道对地基及邻近端桩的响应

获取原文
获取原文并翻译 | 示例
           

摘要

Considering that the subway tunnelling projects in the Chongqing region are located in strata dominated by sandstone and mudstone, the main empirical construction parameters (excavation thrust = 5 880 similar to 6 860 kN, average pea gravel content (APC) = 85%, and grouting pressure (GP) = 0.3 MPa) were obtained by engineering surveys; these empirical parameters were similar to those optimized under interval tunnel construction conditions. Additionally, a simulation method was developed based on the construction characteristics of a single shield TBM by using the ADINA software to simulate the construction process of subway tunnels undercrossing the pile foundations (end-bearing piles) of an old surface building in the composite strata of the Chongqing Rail Transit Loop Line. A sensitivity analysis was performed on the calculation parameters first because the changes in the stratigraphic and TBM construction parameters greatly influenced the calculation results. Then, we used the modified calculation parameters to study the effects of tunnel construction on the settlements of the ground surface and pile foundations in the composite strata, and these effects were compared to the field monitoring results. The results showed good agreement between the numerical calculations and the monitoring findings. Thus, the methodology and empirical construction parameters adopted in this paper can provide a reference for the construction of other tunnel sections of this project in similar construction conditions.
机译:考虑到重庆地区的地铁隧道工程位于以砂岩和泥岩为主的地层中,主要经验构造参数(开挖推力= 5 880,相当于6 860 kN,平均豌豆砾石含量(APC)> = 85%),以及注浆压力(GP)= 0.3 MPa)是通过工程勘测获得的;这些经验参数类似于在区间隧道施工条件下优化的参数。另外,利用ADINA软件,基于单盾构TBM的施工特点,提出了一种模拟方法,模拟了穿越复合地层中旧地面建筑物桩基础(端承桩)的地铁隧道的施工过程。重庆轨道交通环线。首先要对计算参数进行敏感性分析,因为地层和TBM施工参数的变化会极大地影响计算结果。然后,我们使用修改后的计算参数来研究隧道施工对复合地层中地面和桩基沉降的影响,并将这些影响与现场监测结果进行比较。结果表明,数值计算与监测结果吻合良好。因此,本文采用的方法和经验性施工参数可为该工程在相似施工条件下其他隧道段的施工提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号