首页> 外文期刊>Tunnelling and underground space technology >Experiences of gripper TBM application in shaft coal mine: A case study in Zhangji coal mine, China
【24h】

Experiences of gripper TBM application in shaft coal mine: A case study in Zhangji coal mine, China

机译:竖井式掘进机掘进机掘进机应用经验:以中国章集煤矿为例

获取原文
获取原文并翻译 | 示例
           

摘要

TBMs had been introduced to coal mining industries for decades. However, the applications of TBM in coal mines which have vertical shafts as their main accesses were barely reported. This paper presents a case study of TBM tunnelling works in Zhangji coal mine, China. The roadways, having diameter of 4.53 m and average buried depth of 500 m were excavated by a gripper TBM. Before the TBM excavation works, TBM delivering from surface to underground working site through vertical shaft and assembling TBM within roadways were taken into account. The problems encountered during the TBM tunnelling such as weak grounds, coalbed methane (CBM) inflow and abnormal cutter wear are discussed. In addition, solutions and remedial works of each problem are proposed. Consequently, the downtimes of TBM were reduced significantly and the average penetration rate increased from 5 to 8 m/d to 18.67 m/d and the highest penetration rate of 30.7 m/d was obtained. The working experiences indicate that with proper modifications on TBM configuration and excavation techniques, TBMs are able to provide a safety, efficient and competitive alternative to roadway excavation within shaft coal mines.
机译:TBM已被引入煤矿行业数十年。然而,TBM在以竖井为主要出入口的煤矿中的应用几乎没有报道。本文以中国张集煤矿的TBM隧道掘进工程为例。直径为4.53 m,平均埋深为500 m的巷道由抓具TBM开挖。在进行TBM开挖工作之前,要考虑到TBM是通过垂直竖井从地面输送到地下工作现场以及在巷道内组装TBM的。讨论了在TBM掘进过程中遇到的问题,例如地面薄弱,煤层气(CBM)流入和异常的刀具磨损。此外,提出了每个问题的解决方案和补救措施。因此,TBM的停机时间显着减少,平均渗透率从5到8 m / d增加到18.67 m / d,最高渗透率达到30.7 m / d。工作经验表明,通过对TBM配置和开挖技术进行适当的修改,TBM能够为竖井煤矿内的巷道开挖提供安全,高效和有竞争力的替代方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号