Behaviors of existing twin subway tunnels due to new subway station excavation below in close vicinity

机译:由于附近新地铁站开挖而导致的现有双地铁隧道的行为

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents a case of Chongwenmen subway station of Beijing Subway Line 5 excavated below the existing Line 2, which was the first project of new subway construction below existing subway in Beijing. The minimum clearance between the new and the existing tunnels was 1.98 m. The layout, the geological and hydrogeological conditions, the construction process, and the monitoring measures are introduced. During construction, the maximum settlement of the existing tunnels reached 31.3 mm and the speed of trains run inside the existing tunnels was slowed down. In order to compensate the settlement of the existing tunnels and ensure the operational safety of the trains running inside the existing tunnels, compensation grouting was adopted. The pillar between the existing and the new tunnels was strengthened by grouting first. Then the pillar and the existing tunnels were uplifted together by specific controlled grouting pressure. The compensation grouting successfully uplift the existing tunnels. Moreover the subsequent settlements of the existing tunnels were small as the pillar had been sufficiently reinforced.
机译:本文以北京地铁5号线崇文门地铁站在现有2号线下方开挖为例,这是北京现有地铁之下的新地铁建设的第一个项目。新隧道与现有隧道之间的最小间隙为1.98 m。介绍了布局,地质水文地质条件,施工过程和监测措施。在施工过程中,现有隧道的最大沉降量达到了31.3毫米,并且在现有隧道内运行的火车的速度也减慢了。为了补偿现有隧道的沉降并确保在现有隧道内运行的列车的运行安全,采用了补偿灌浆。首先通过注浆加固现有隧道和新隧道之间的支柱。然后,通过特定的控制灌浆压力将立柱和现有隧道一起抬高。补偿灌浆成功地提升了现有的隧道。此外,由于支柱已经得到充分加固,因此现有隧道的后续沉降很小。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号