...
首页> 外文期刊>SPE Production and Facilities >Commercial Deployment of Low-Dosage Hydrate Inhibitors in a Southern North Sea 69 km Wet-Gas Subsea Pipeline
【24h】

Commercial Deployment of Low-Dosage Hydrate Inhibitors in a Southern North Sea 69 km Wet-Gas Subsea Pipeline

机译:低剂量水合物抑制剂在北海南部69公里湿气海底管道中的商业部署

获取原文
获取原文并翻译 | 示例
           

摘要

Theshold hydrate inhibitor (THI) has been successfully commer- cially deployed at a low-dose rate in a wet-gas pipeline connecting the Hydr-West Sole gas fields to the onshore Easington gas ter- minal. These gas fields are BP Amoco operated assets and are located in the U.K. sector of the southern North Sea, approxi- mately 70 km offshore of the Easington gas terminal. Three gas platforms: Hyde, West sole Charlie, and West Sole Bravo, are connected to a common 24-in.-diam flowline to shore and typical gas production lies in the range 50-180 mmscf/d (million stan- dard cubic feet per day).
机译:水合物阻滞剂(THI)已成功地以低剂量率在连接Hydr-West Sole气田和陆上Easington天然气终点站的湿气管道中进行了商业推广。这些气田是BP Amoco运营的资产,位于北海南部的英国地区,距Easington天然气码头约70公里。三种天然气平台:海德,西索理查理和西索尔布拉沃分别连接到一条通向海岸的24英寸直径输油管线,典型的天然气产量为50-180毫米标准立方英尺/天(百万标准立方英尺)每天)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号