Once works start on site it is almost inevitable that changes will need to be made to the design. These may be due to unforeseen factors - such as an underground pipe or cable being in a different location from that shown on the relevant operator's plan - or due to a refinement of the design, for any one of dozens of reasons. Whatever the reason, changes will lead to a re-evaluation of the overall scheme to ensure that the original brief is complied with and that any existing buildings are as far as possible restored to good condition. And that, in turn, may require less essential works to be deferred or completely omitted. Or it may be decided that the scope of the works should be slightly amended or enlarged.
机译:一旦现场开始工作,几乎不可避免地需要对设计进行更改。这些可能是由于不可预见的因素(例如,地下管道或电缆与相关运营商的计划所示位置不在同一位置)或由于多种原因之一而对设计进行了改进。无论出于何种原因,更改都会导致对整个方案进行重新评估,以确保符合原始要求,并确保所有现有建筑物尽可能恢复良好状态。反过来,这可能需要推迟或完全省略不太重要的工作。或者,可以决定对作品的范围进行略微修改或扩大。

著录项

  • 来源
    《RIBA Journal》 |2008年第4期|p.61-62|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号