Building contracts generally specify a fixed weekly or daily sum of money (known as liquidated damages) to be used to compensate the employer if a project is handed over late as a result of contractor delay. In the event of such delay, as long as the relevant notices have been given to the contractor, the employer can either deduct the agreed sums from amounts otherwise payable to the contractor, or ask the contractor to reimburse the employer direct. Over the years, cases have provided guidance various issues.
机译:建筑合同通常指定固定的每周或每日金额(称为清算赔偿金),以便在承包商延迟因项目被交还的项目后,以弥补雇主。如果发生这种延迟,只要向承包商提供相关通知,雇主就可以从承包商拒绝向承包商支付的金额扣除商定的金额,或者要求承包商将雇主偿还直接。多年来,案件提供了各种问题的指导。

著录项

  • 来源
    《RIBA Journal》 |2019年第3期|57-57|共1页
  • 作者

    Douglas Wass;

  • 作者单位

    Macfarlanes LLP;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号