...
首页> 外文期刊>Quaternary International >Effects on sediments following water-sediment regulations in the Lixia River watershed, China
【24h】

Effects on sediments following water-sediment regulations in the Lixia River watershed, China

机译:丽霞河流域水沙规律对沉积物的影响

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

To decrease deposition of sediment and improve navigation capacity in the Lixia River watershed, China, a water transfer process was initiated. From 2006 to 2007, water was transferred from the Yangtze River to the Lixia River watershed to divert sediment out of coastal channels. Different operational strategies were employed, including varying the transfer capacity and timing of the water and altering the management and regulation of the water resources project (i.e., the volume of water transferred and the height of the water gate). The types of operational models that were applied to determine changes in the water quantity included the following: water level, cross-section, scouring, and silting. Based on the cross-sectional area, the volumes of silting and scouring in the lower reaches of four coastal channels were estimated. It is generally known that river discharge and tidal mixing affect sediment scouring considerably. However, the most pronounced scouring effects were found to occur upon suddenly opening the sluice gate with the water head upstream of the gate. Thus, sediment scouring should be considered preferentially for the downstream channel of the Sheyang River during a spring tide, but should be considered preferentially for the Doulong and Xinyang ports during a neap tide. The results of this study provide useful information for local governments and decision-makers to better regulate and control flow and sediment transport relationships in order to restore and maintain flood channels; these results will assist in managing water transfer projects. (C) 2015 Elsevier Ltd and INQUA. All rights reserved.
机译:为了减少中国漓霞河流域的沉积物沉积并提高通航能力,启动了输水过程。从2006年到2007年,水从长江流到了丽霞河流域,将沉积物从沿海渠道转移出去。采用了不同的操作策略,包括改变水的输送能力和时间安排以及改变水资源项目的管理和监管(即,输送的水量和水闸的高度)。用于确定水量变化的操作模型的类型包括以下内容:水位,横截面,冲刷和淤积。根据截面积,估算了四个沿海航道下游的淤积和冲刷量。众所周知,河水排放和潮汐混合会严重影响泥沙冲刷。但是,发现在水闸位于水闸上游的情况下突然打开水闸时,会出现最明显的冲刷效果。因此,春季潮汐时应优先考虑射阳河下游河道的冲淤,而潮汐潮时应优先考虑斗龙和信阳港的冲淤。这项研究的结果为地方政府和决策者更好地调节和控制流量与泥沙输送关系,以恢复和维持洪水通道提供了有用的信息;这些结果将有助于管理调水项目。 (C)2015 Elsevier Ltd和INQUA。版权所有。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号