Justification of a novel pipe-in-tunnel

机译:新型管道隧道的合理性

获取原文
获取原文并翻译 | 示例
           

摘要

As part of a major pipeline construction project, Laing O’Rourke had a requirement to install a section of pipelinenbeneath a river estuary. Due to a number of reasons it was not possible to negotiate the crossing using conventionalntechniques such as horizontal directional drilling (HDD) and an alternate method had to be sought. A feasibility studynwas undertaken and it was decided that a pipe-in-tunnel approach was the most viable. Due to constraints at the pointsnof entry and exit it was necessary to cut two vertical shafts, one on each river bank.
机译:作为一项重大管道建设项目的一部分,Laing O’Rourke要求在河口下方安装一段管道。由于多种原因,不可能使用诸如水平定向钻探(HDD)之类的常规技术来协商过桥,因此必须寻求一种替代方法。进行了可行性研究,并确定最可行的方法是在隧道中使用管道。由于进出水口的限制,必须切掉两个竖井,每个河岸一个。