...
首页> 外文期刊>pipes and pipelines international >Rehabilitation of a pipeline in a new European country
【24h】

Rehabilitation of a pipeline in a new European country

机译:修复欧洲新国家的管道

获取原文
获取原文并翻译 | 示例
           

摘要

ILF was invited to assess the integrity status of two pipelines in a new European country. In the last few years there were somenleakages and nobody really knew the exact position of these pipelines and equipment. The pipelines were installed 30 yearsnago, and there was little documentation available; the pipelines are non-piggable and are without any cathodic protection.nThe client decided to carry out an integrity-assessment study for these two major pipelines before deciding on rehabilitationnprocedures.
机译:ILF被邀请评估一个新欧洲国家中两条管道的完整性状态。在过去的几年中发生了泄漏,没有人真正知道这些管道和设备的确切位置。这些管道已经安装了30年,而且几乎没有可用的文档。客户决定在决定修复程序之前,对这两个主要管道进行完整性评估研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号