...
【24h】

November 2011 News Wrap

机译:2011年11月新闻包装

获取原文
获取原文并翻译 | 示例
           

摘要

This month, pipeline projects have seen progress at all stages. Gas agreements have been signed, loans have beennsecured and details have been agreed upon, which will all lead to further pipeline development. New pipelines havenbeen proposed, pipeline planning processes have been furthered with the submission of a number of key reports, andnon the PNG LNG Project, offshore pipelay has begun. Gas is now flowing through both the first of the twin Nord Streamnpipelines as well as the restarted Libyan branch of the Greenstream Pipeline, and the controversial Keystone XL Pipelinenis currently investigating new route options following the selection of a construction contractor.
机译:本月,管道项目在各个阶段均取得了进展。签署了天然气协议,获得了贷款担保,并商定了细节,所有这些都将导致进一步的管道开发。尚未提出新的管道建议,随着许多关键报告的提交进一步推进了管道规划过程,并且除了PNG LNG项目外,海上管道铺设已经开始。天然气现在既流经两条北流溪管线,又流经重新启动的绿流管线利比亚分支机构,而备受争议的Keystone XL Pipelinenis在选择建筑承包商后目前正在研究新的路线选择。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号