...
首页> 外文期刊>pipes and pipelines international >Environmental considerations for pipeline abandonment
【24h】

Environmental considerations for pipeline abandonment

机译:放弃管道的环境考虑

获取原文
获取原文并翻译 | 示例
           

摘要

Since the 1920s, over 400,000 km of petroleum pipelines have been installed in Alberta. Pipeline abandonment isnan increasingly relevant issue as the pipeline network ages. The full or partial abandonment of pipeline systems isnnecessitated by factors such as wind or water erosion issues, pipeline integrity issues, changes in source supply andncustomer demand, urban development encroachment and regulatory requirements.nPipeline abandonment-in-place is generally the preferred option based on the technical condition and environmentalnsustainability of the pipeline; however, in some cases pipeline removal or partial removal cannot be avoided. In all cases,nthe planning process for abandonment includes technical evaluation, risk assessment, environmental assessment,nlandowner consultation, and/or evaluation of future land use. Abandonment plans must also include environmentalnprotection measures to be implemented during the removal of any pipeline segment and consideration of the postabandonmentnimplications of any pipeline left in place. These measures include topsoil conservation, erosion/sedimentncontrol and reclamation.nThis article discusses environmental protection measures for pipeline abandonment, using issues faced duringnabandonment of one of the oldest natural gas pipelines in Alberta as a case study. Challenges faced during this projectnincluded gathering of appropriate historical information including leak history and maintenance records, removal of allnabove-ground facilities, accommodations for future land use plans including road development, and measures taken tonminimise the risk of the abandoned pipeline becoming a water conduit. In addition, the article will discuss the extensivenplanning and construction effort required to undertake pipeline abandonment at several fish-bearing watercoursencrossings, where pipeline exposures during high-water events necessitated pipeline removal. A primary objective in thenplanning and the removal of the abandoned pipeline was minimal disturbance of the land.
机译:自1920年代以来,艾伯塔省已安装了超过40万公里的石油管道。随着管道网络的老化,废弃管道是越来越重要的问题。风或水蚀问题,管道完整性问题,源供应和客户需求的变化,城市发展侵占和法规要求等因素都需要全部或部分放弃管道系统。管道的技术条件和环境可持续性;但是,在某些情况下,无法避免管道拆除或部分拆除。在所有情况下,弃置的计划过程都包括技术评估,风险评估,环境评估,土地所有者咨询和/或未来土地使用评估。弃置计划还必须包括在拆除任何管线段期间要执行的环境保护措施,并考虑留在原处的任何管线的弃置后含义。这些措施包括表土养护,侵蚀/沉积物控制和填海。n本文以艾伯塔省最古老的天然气管道之一弃置期间面临的问题为例,讨论了废弃管道的环境保护措施。在该项目中面临的挑战包括收集适当的历史信息,包括泄漏历史和维护记录,拆除地上设施,为包括土地开发在内的未来土地使用计划提供住宿,并采取措施最大程度地减少了废弃管道成为输水管道的风险。此外,本文还将讨论在多个含鱼水道交叉处进行管道废弃所需要的广泛规划和建设工作,在高水位事件中管道暴露需要将管道拆除。规划和拆除废弃管道的主要目的是对土地的干扰最小。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号