...
首页> 外文期刊>MOG >CLOCKING ON: A WORK DIARY IN THE LIFE OF VERITY NORMAN
【24h】

CLOCKING ON: A WORK DIARY IN THE LIFE OF VERITY NORMAN

机译:时刻表述:真实诺曼人生的一本工作日记

获取原文
获取原文并翻译 | 示例
           

摘要

Mostly the production plan, the scheduling of the build and the bit that goes before that too - chasing the dealers. When the car gets booked I have to chase the dealers to get the specification. Once the spec is in I produce all the production paperwork, called the build book, which then goes into production! The front of the build book has the specification and the rest of the document is for all the operatives to fill in throughout the workshops. I have to be organised; it's all manual, so if anything goes wrong (which it rarely does!) it comes back on me! So it's all got to be bob on.
机译:大多数情况下,是生产计划,建造计划以及在此之前的工作-追逐经销商。预定汽车时,我必须追逐经销商以获得规格。规格一旦制定,我便会制作所有生产文件,称为构建书,然后将其投入生产!建造手册的开头有规范,而其余文档则供所有操作人员在整个研讨会中填写。我必须有条理。这都是手动的,所以如果出现任何问题(很少发生!),它将再次出现在我身上!因此,一切都必须继续下去。

著录项

  • 来源
    《MOG》 |2016年第4期|52-54|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号